Answer:
The right answer is "$14,496".
Step-by-step explanation:
The given values are:
Direct material cost,
= $7700
Labor hours,
= 178
Wage rate,
= $22 per hour
Machine hours,
= 90
Predetermined overhead rate per machine,
= $32
Now,
The direct labors cost will be:
=
=
=
($)
Mfg. overhead costs will be:
=
=
=
($)
So,
The total manufacturing cost will be:
=
=
($)