Which of the following is true of a physical flow schedule?

a.It is the same as an equivalent units schedule, which is prepared at the end of a reporting period.
b.It shows the units to account for and what happened to them.
c.It measures the output of a period.
d.It is used to determine the equivalent units transferred to the subsequent department.

User NickAbbey
by
8.5k points

1 Answer

5 votes

Final answer:

A physical flow schedule shows the units to account for and what happened to them in a production process. It helps track the quantity and status of units at different stages.

Step-by-step explanation:

A physical flow schedule is a schedule that shows the units to account for and what happened to them. It measures the movement and flow of physical units through a production process. It helps track the quantity and status of units at different stages of the production process.

For example, a physical flow schedule for a manufacturing process may show the units received, units completed, units in progress, and units transferred to the next department. It provides a visual representation of how the units move through the production process.