Two construction companies, Big Time Builders and Goldstar Construction, are building tunnels for a city. It takes Big Time Builders 4 weeks to build 84 meters of tunnel. This equation describes how fast Goldstar Construction builds tunnels, where y represents the length of tunnel it builds in meters and x represents the number of weeks it takes. y=19x. Which company works at a faster rate?

a. Big Time Builders
b. Goldstar Construction
c. Both work at the same rate
d. It cannot be determined from the given information

2 Answers

3 votes

It’s 2, BigTime Builders

Step-by-step explanation:

User Yoyoyoyosef
by
8.9k points
5 votes

Final answer:

Big Time Builders works at a faster rate, building tunnels at a rate of 21 meters per week.

Step-by-step explanation:

To determine which construction company works at a faster rate, we can compare the rates at which each company builds tunnels. The rate at which Big Time Builders builds tunnels is 84 meters per 4 weeks, which can be simplified to 21 meters per week. The rate at which Goldstar Construction builds tunnels is given by the equation y = 19x, where y represents the length of tunnel in meters and x represents the number of weeks. To determine the rate, we can divide the length by the number of weeks, so the rate for Goldstar Construction is 19 meters per week. Comparing the two rates, we can see that Big Time Builders works at a faster rate, building tunnels at a rate of 21 meters per week.

User David Veeneman
by