Once the bottleneck is identified, can you simply move the machines/operations around like Herbie was moved to the front of the line? So how do you solve the problem of "moving Herbie to the front"?

User Yogevbd
by
6.6k points

1 Answer

2 votes

Final answer:

Moving machines or operations to solve a bottleneck requires careful planning and coordination.

Step-by-step explanation:

Identifying a bottleneck in a production process is an important step in improving efficiency. Once the bottleneck is identified, it is possible to move machines or operations to alleviate the bottleneck and increase production capacity. However, it is not as simple as just moving a machine to the front of the line, like Herbie in the example. There are several considerations to take into account, such as the interdependencies between operations, space constraints, and the impact on other parts of the process. It requires careful planning and coordination to effectively solve the problem of a bottleneck.

User Artur Carvalho
by
6.9k points