67.5k views
3 votes
Cullumber Construction's manufacturing costs for August when production was 1,140 units are as follows:

1. Direct materials cost: $11,400
2. Direct labor cost: $6,800
3. Variable manufacturing overhead cost: $3,420
4. Fixed manufacturing overhead cost: $5,000

1 Answer

4 votes

Final answer:

The subject of this question is Business. The manufacturing costs for Cullumber Construction in August when production was 1,140 units are broken down into direct materials cost, direct labor cost, variable manufacturing overhead cost, and fixed manufacturing overhead cost.

Step-by-step explanation:

The subject of this question is Business.

Given the manufacturing costs for Cullumber Construction in August when production was 1,140 units, the breakdown of costs is as follows:

  • Direct materials cost: $11,400
  • Direct labor cost: $6,800
  • Variable manufacturing overhead cost: $3,420
  • Fixed manufacturing overhead cost: $5,000

To determine the total manufacturing cost, we can add up these costs:

  • Direct materials cost + Direct labor cost + Variable manufacturing overhead cost + Fixed manufacturing overhead cost = Total manufacturing cost.
  • $11,400 + $6,800 + $3,420 + $5,000 = Total manufacturing cost.
  • $______ = Total manufacturing cost.
User LIAL
by
7.8k points