A constraint is anything that aids the organization in completing the task.

A. True
B. False

User Igorski
by
7.4k points

1 Answer

4 votes

Final answer:

The statement is false; a constraint is not something that aids an organization but rather a limitation or condition that must be satisfied by a design, such as budget limits or time restrictions.

Step-by-step explanation:

The statement that a constraint is anything that aids the organization in completing the task is False. A constraint is actually a limitation or condition that must be satisfied by a design. Constraints are non-negotiable factors that must be considered or adhered to during the planning and execution of a project or design. They can include things like budget limits, time restrictions, available resources, or specific project requirements. Unlike constraints, criteria are measurable standards or attributes of a design used to compare different possible designs and determine which better solve the design problem. For instance, weight and size are both criteria that can be used in determining the efficiency or practicality of different design options.

User Jonasm
by
8.0k points