Final answer:
To lift a 200 kg stack of bricks to a height of 3 meters, the work done is calculated using the formula for work against gravity. The work done is 5886 Joules.
Step-by-step explanation:
Calculating Work Done to Lift Bricks
To calculate the work done in lifting the 200 kg stack of bricks to a height of 3 meters, we use the formula for work done against gravity, which is work (W) = force (F) × distance (h). The force is equivalent to the weight of the object, which can be calculated using the formula weight (W) = mass (m) × gravitational acceleration (g). Assuming standard gravity, g is approximately 9.81 m/s².
First, calculate the weight of the bricks:
Weight = Mass × Gravitational acceleration = 200 kg × 9.81 m/s² = 1962 N
Then, calculate the work done:
Work = Force × Distance = 1962 N × 3 m = 5886 J
So, the amount of work required to lift the bricks is 5886 Joules.