Final answer:
The budgeted direct labor cost per unit of Product A cannot be determined accurately without the number of units produced.The correct answer is option A.
Step-by-step explanation:
In order to find the budgeted direct labor cost per unit of Product A, we need to refer to the given information and calculate the total cost using the provided wage and quantity labor supplied:
- Wage: $8/hr
- Quantity Labor Supplied: 1,900
We can calculate the direct labor cost per unit of Product A using the following formula:
Total Cost = Wage × Quantity Labor Supplied
Substituting the given values:
Total Cost = $8/hr × 1,900 = $<<8*1900=15200>>15,200
Since the question asks for the budgeted direct labor cost per unit, we need to divide the total cost by the number of units produced:
Budgeted Direct Labor Cost per Unit = Total Cost / Number of Units
Unfortunately, the number of units for Product A is not provided, so we cannot determine the budgeted direct labor cost per unit of Product A accurately without that information. Therefore, we cannot provide a specific answer for this question.