Which of the following is NOT a project constraint?

1) the budget
2) the customer requirements
3) the schedule
4) the technical specifications

User Saranga A
by
6.6k points

1 Answer

6 votes

Final answer:

A project constraint is a limitation or condition that must be satisfied by a design. The customer requirements is NOT a project constraint, as it represents the goals and expectations set forth by the customer, rather than a limitation or condition that must be met.

Step-by-step explanation:

A project constraint is a limitation or condition that must be satisfied by a design. The constraints help define the boundaries within which a project must be completed. In the given options, the customer requirements is NOT a project constraint, as it represents the goals and expectations set forth by the customer, rather than a limitation or condition that must be met.