Stringent performance measures can lead to increased time, increased scope, and increased cost?

1) True
2) False

User Bhabadyuti
by
8.1k points

1 Answer

6 votes

Final answer:

Stringent performance measures can lead to increased time, increased scope, and increased cost.

Step-by-step explanation:

Stringent performance measures can indeed lead to increased time, increased scope, and increased cost.

When performance measures become more stringent, it often means that higher standards and more detailed requirements are being imposed. This can result in extra time being spent on completing tasks to meet these stricter measures. For example, in project management, if performance measures require more frequent and thorough reporting, it can add to the time needed to collect and analyze data and prepare reports.

Similarly, the increased scope can occur when performance measures demand more deliverables or additional requirements to be met. For instance, in manufacturing, if performance measures require products to meet higher quality standards, additional testing and inspections might be necessary, leading to an extended scope.

Lastly, stringent performance measures can also contribute to increased costs. When measures demand higher levels of quality, more resources, tools, and materials might be needed to meet those standards. Thus, the costs associated with meeting these stringent measures can rise.