NRC required what to be included in computer planning system of RAM acceptance test?

User Penn
by
7.5k points

1 Answer

5 votes

Final answer:

The NRC mandates a computer planning system for RAM acceptance testing, emphasizing integrity, reliability, redundancy, error-checking, and comprehensive documentation.

Step-by-step explanation:

The Nuclear Regulatory Commission (NRC) requires specific items to be included in the computer planning system for RAM acceptance test. RAM, or random access memory, is a critical component in computer systems, especially when considering systems used in safety-critical environments, such as nuclear power plants. In the context of the NRC, the regulatory requirements may include ensuring the integrity and reliability of the RAM, the ability to safely handle predicted workloads, and the incorporation of redundancy and error-checking mechanisms.

Comprehensive testing and documentation are typically mandatory, involving stress testing to ascertain durability under different scenarios, thorough performance evaluations, and meticulous verification against established safety standards. Additionally, any anomalies or errors detected during testing must be systematically recorded and addressed. Methods for disaster recovery and data integrity checks are also crucial components that would likely be included in the planning system for a RAM acceptance test as required by the NRC.

User David Ansermot
by
8.0k points