What fields are required if setting up a Layout set to be used with Project Costing? (select three)

A. Expenditure Type
B. Task
C. Billable
D. Payroll time Type
E. Project Name or Project Number

User ThanaDaray
by
7.9k points

1 Answer

4 votes

Final answer:

In setting up a layout set for Project Costing, the required fields are Expenditure Type, Task, and Project Name or Project Number to ensure accurate tracking and management of project costs.

Step-by-step explanation:

When setting up a Layout set for use with Project Costing, it is essential to include certain fields to ensure the system can accurately track and manage project costs. The required fields are:

  • Expenditure Type: This identifies the nature of the costs, helping in categorizing and applying cost rates.
  • Task: This field represents the specific segment of the project to which the costs are assigned, aiding in detailed project tracking.
  • Project Name or Project Number: This is critical as it uniquely identifies the project within the system, allowing for project-specific reporting and analysis.

The fields 'Billable' and 'Payroll Time Type' may be important in certain contexts but are not universally required for setting up a layout set in project costing.