Final answer:
The average rate of change in steel production over the six days is 0.4 tons per day.
Step-by-step explanation:
To calculate the average rate of change in steel production over the six days, we need to divide the change in production (2.4 tons) by the time period (6 days). The average rate of change is given by the formula:
Average Rate of Change = Change in Production / Time Period
Let's substitute the given values into the formula:
Average Rate of Change = 2.4 tons / 6 days = 0.4 tons per day
Therefore, the average rate of change in steel production over the six days is 0.4 tons per day.