117k views
0 votes
Large system projects being done across several sites often uses which kind of process model?

User Nightclub
by
7.9k points

1 Answer

5 votes

Final answer:

Large system projects typically use a spiral design process that allows for iterative development, which is essential for managing the complexity and collaboration required for such projects.

Step-by-step explanation:

Large system projects being done across several sites often use a spiral design process. This model is adapted to the complexity of organizing large teams and resources across multiple locations. Unlike the sequential process, in which steps follow one another in a linear fashion, the spiral process allows for iterative development. This accounts for architectural and engineering practices where prototyping and evaluation lead to continuous improvement of a project. For instance, architects and companies often build smaller-scale models or prototypes to visualize and refine their designs more effectively.The spiral process is particularly beneficial for large projects within societal structures, given the necessity for collaboration and the allocation of extensive resources by organizations like governments, corporations, and churches. By embracing an iterative approach, these large projects can be better managed, ensuring that strengths and weaknesses are addressed throughout the process, leading to a stronger final product.

User Uuid
by
7.4k points