Final answer:
The work done is 10,000 J and the power is 1000 W.So, the correct option is:
b) Work done = 10,000 J, Power = 1000 W
Step-by-step explanation:
The work done can be calculated using the formula:
Work = Force x Distance
Given that the distance is 20m and the force is 500N, we can substitute these values into the formula:
Work = 500N x 20m = 10,000 J
So, the work done is 10,000 Joules.
The power can be calculated using the formula:
Power = Work / Time
Given that the work done is 10,000 Joules and the time is 10 seconds, we can substitute these values into the formula:
Power = 10,000 J / 10 s = 1000 W
So, the power is 1000 Watts.So, the correct option is:
b) Work done = 10,000 J, Power = 1000 W