Final answer:
The current line efficiency is 9.09% and the production rate is 0.13 units per minute.
Step-by-step explanation:
The current line efficiency can be calculated using the formula:
Line Efficiency = Cycle Time / (Cycle Time + Average Downtime)
Given the values, the current line efficiency is:
Line Efficiency = 0.70 / (0.70 + 7.0) = 0.70 / 7.70 = 0.0909 or 9.09%
The production rate can be calculated using the formula:
Production Rate = 1 / (Cycle Time + Average Downtime)
Given the values, the current production rate is:
Production Rate = 1 / (0.70 + 7.0) = 1 / 7.70 = 0.1299 or 0.13 units per minute