What will determine how the project will be conducted and the funds will be made available for the project?

a. The Owner's objective
b. The architect's design
c. City hall
d. The construction cost estimate
e. The contractor bid

User Noah May
by
8.2k points

1 Answer

3 votes

Final answer:

The owner's objective is the primary factor that determines how a project will be conducted and how funds will be allocated. This includes the owner's requirements, expected project scope, and quality. Other components such as the architect's design and the contractor bid reflect and serve these objectives.

Step-by-step explanation:

The components that will determine how the project will be conducted and how the funds will be made available involve multiple aspects. However, the most fundamental factor is a. The Owner's objective. This includes what the owner wants to achieve with the project, their requirements, and the level of quality and scope they are expecting. These objectives will influence decisions at every stage of the project, from planning to execution.

Other factors such as b. The architect's design, c. City hall regulations, d. The construction cost estimate, and e. The contractor bid are all important, but they typically reflect or serve the owner's objectives. The owner's budget and objectives are central to determining how much funding is available and how it is allocated during the project lifecycle.

Beginning with the first step in the design process, 2. Define the problem, every subsequent decision is shaped to meet the owner's vision. Subsequent steps such as 1. Explore possibilities, 3. Select a design, and 4. Generate ideas are all part of the process to achieve the owner's end goal.