144k views
1 vote
The following are the areas of the potential risks. Which is belong to requirements engineering sub disciplines of validation processes?

A. Requirements prioritization
B. Technically difficult features
C. Inspection proficiency
D. Ambiguous terminology

1 Answer

0 votes

Final answer:

Ambiguous terminology is the potential risk in requirements engineering that is specifically related to validation processes, as it can lead to misunderstandings in the design requirements.

Step-by-step explanation:

In the context of requirements engineering subdisciplines, the area of potential risk that belongs to validation processes is D. Ambiguous terminology. During the validation process, it's crucial to ensure that the requirements are understood correctly and are clearly articulated, as ambiguous terminology can lead to misunderstandings and errors in later phases of the engineering design process. Effective communication skills are essential to clarify any ambiguities and to ensure all stakeholders have a shared understanding of the requirements.

Meanwhile, requirements prioritization involves deciding which requirements are the most critical to address initially and which can be delivered later. It does not inherently involve validation but is a critical part of requirement management. Technically difficult features are more about technical challenge rather than validation, and inspection proficiency relates to the quality of the review process but is not specific to validation.

User Amado
by
8.6k points