The requirements engineering process is ____

A. The same for each organization and process
B. Initiated at the beginning of a project and continues to be refined throughout the life cycle.
C. A discrete fermented activity of the software life cycle.
D. A continuous process that ends when requirements are specified and documented

1 Answer

5 votes

Final answer:

The requirements engineering process is initiated at the start of a project and is refined continuously throughout the project's life cycle. It is iterative and cyclical, adapting to the project's needs rather than being a one-time or discrete activity.

Step-by-step explanation:

The requirements engineering process is B. Initiated at the beginning of a project and continues to be refined throughout the life cycle. This is because engineering design problems are open-ended and there are usually several solutions that can satisfy the desired needs. Therefore, the engineering design process is not a one-time activity but an iterative and cyclical process that evolves as the project develops. It is important to understand that the design process should be adapted to the circumstances of the design team and the particular project, and should undergo continuous improvement. The structured design process helps in making informed decisions and ensures that all important aspects of the product are considered.

In contrast to the other options given:

  • A. The same for each organization and process is incorrect because the design process should be adapted according to the specific requirements of the project.
  • C. A discrete fermented activity of the software life cycle is incorrect as the requirements engineering is not a one-off activity but an ongoing one.
  • D. A continuous process that ends when requirements are specified and documented is incorrect because the process does not end after requirements are documented; it evolves and adapts as the project progresses.