After installation of a new machine, the physicist verifies mechanical, safety, and dose delivery systems. This is called ____________

1 Answer

7 votes

Final answer:

The verification of a new machine for mechanical, safety, and dose delivery systems is known as commissioning. This process is crucial for confirming the machine's performance and safety standards prior to its clinical use.

Step-by-step explanation:

After the installation of a new machine, the physicist verifies mechanical, safety, and dose delivery systems. This process is called commissioning. Commissioning is critical in ensuring that the machine operates correctly and safely before it is used for clinical applications, such as patient treatment. This involves tests and procedures that confirm the machine's performance matches the specifications and that it adheres to the necessary regulation and safety standards.

In a clinical setting, such as a hospital, commissioning is part of a broader quality assurance program that also includes checks similar to those practiced in the surgical safety checklist, such as verification of patient identity, surgical site, and procedure. During the commissioning phase, members of the medical team, including surgeons, anesthesiologists, and nursing staff, would ensure that all equipment is functional and that they are prepared for any critical events that may occur, mirroring the preparation steps for a surgical procedure.

Additionally, just like in pharmacovigilance, where ongoing monitoring of a drug's safety and efficacy is required after it goes to market, medical equipment too must undergo regular evaluations to ensure long-term safety and efficacy—a concept that applies to both drug monitoring and equipment commissioning.