Final answer:
The initial valuation of the land is $3.5 million and the initial valuation of the building is $1.5 million. If we assume the building is demolished, its initial valuation would be $0. The initial valuation of the land, after clearing and grading, remains $3.5 million.
Step-by-step explanation:
To determine the initial valuation of each asset acquired by Samtech Manufacturing, we need to consider the purchase price, additional expenditures, and the fair values estimated by the independent appraisal.
- Land: The initial valuation of the land is $3.5 million, which is its estimated fair value.
- Building: The initial valuation of the building is $1.5 million, which is its estimated fair value.
If we assume that the building is demolished, we also need to consider the demolition costs and salvaged materials:
- Building (after demolition): The initial valuation of the building, after demolition, would be $0 since it no longer exists.
- Salvaged Materials: The salvaged materials were sold for $8,500, which can be considered as a reduction in the demolition costs.
Additionally, we need to consider the costs of clearing and grading the land:
- Land (after clearing and grading): The initial valuation of the land, after clearing and grading, remains $3.5 million.