An industrial factory makes 4 2/3 yards of chain
every minute.the cost of each yardvof chain is birr 6.25 . What is the total cost for all chain produced in 10 minutes?
Step-by-step explanation: The total cost for all chains produced in 10 minutes will be $303.14.
What is the rate?
The rate is the ratio of the amount of something to the unit. For example - If the speed of the car is 20 km/h it means the car travels 20 km in one hour.
An industrial factory makes 4 ³/₅ yards of chain every minute. Then the rate is given as,
Rate = 4 ³/₅
Rate = 4 + 3/5
Rate = 4 + 0.60
Rate = 4.60 yards per minute
The cost of each yard is $6.59. Then the cost per minute is given as,
⇒ $6.59 x 4.60
⇒ $30.314 per minute
Then the total cost for all chains produced in 10 minutes will be given as,
⇒ $30.314 x 10
⇒ $303.14