Answer:
Step-by-step explanation:
WORK IN PROCESS INVENTORY
May 1 balance 3770 May 31 Finished Goods 9234
31-May Material 11470
31-May labour 13870
31-May Overheads 9431.6
may 31 Balance 29307.6
JOB COST SHEET
Job no. Beg. WIP Material Labour Overheads Total
430 1340 3850 3400 2312 10902
431 0 4680 8170 5555.6 18405.6
TOTAL 1340 8530 11570 7867.6 29307.6
Note: Total cost of Job 429 transferred to Finished goods:
Beginning cost 2430
Add: Material 2940
Add: Labour 2300
Add: Overheads (2300*68%) 1564
Total cost of Job 429 9234