Answer: 6.25 cubic feet of concrete
Explanation:
Since the driver delivered 3 2/3 cubic feet of concrete at the first stop, the amount of concrete left on the truck after the first stop would be 9 2/3 minus 3 2/3.
9 2/3 - 3 2/3 = 6 cubic feet
The amount of concrete left on the truck after the second stop would be 6 minus 4 3/4.
6 - 4 3/4 = 1 1/4
Now, we add 5 cubic feet to find the amount of concrete on the truck after the third stop.
1 1/4 + 5 = 6 1/4 or 6.25 cubic feet of concrete