188k views
0 votes
What is the term for combining all occurrences of a component to the lowest level at which it appears on a bill of materials? A) Material explosion B) Low-level coding C) Lead time reduction D) Dependent demand

User Traveh
by
7.6k points

1 Answer

4 votes

The term for combining all occurrences of a component to the lowest level at which it appears on a bill of materials is:

A) Material explosion

User Valera
by
8.4k points