A road crew Musri pave a road that is 7/8 miles long they can repave 1/56 miles each hour how long will it take the crew to repave the road

User Yushin Washio
by
3.1k points

1 Answer

22 votes
22 votes

Given data :


1\text{ hour = }(1)/(56)miles

distance required to cover =


(7)/(8)

thus, the time taken is,


\begin{gathered} =((7)/(8))/((1)/(56)) \\ =(7)/(8)*56 \\ =(7)/(1)*7 \\ =7*7 \\ =49 \end{gathered}

thus the time taken is 49 hours.