Tarzan loaded 4 trucks every 6 hours. At that rate, how long, in hours? will it take to load 6 trucks

User Sker
by
6.2k points

1 Answer

4 votes
Answer: 9 hours

Reasoning:

Trucks/hours

4/6 —-> 6/?

To get 4 to 6 you multiply 4 by 1.5, so you multiply 6 by 1.5, which gets the answer of 9 hours.