Step-by-step explanation:
Process A has fixed costs of $1000 and variable costs of $5.75 per unit. Process B has fixed costs of $850 and variable costs of $5.50 per unit. Which of the following statements is/are TRUE?
Group of answer choices (can choose multiple if applicable):
- It is not possible for a process to have both fixed cost and variable costs lower than those of another process.
- Process B is cheaper than process A at all volumes.
- Process A should be selected for very large production volumes.
- The crossover point is 600 units.