Answer: 20
Step-by-step explanation:
In 1.5 hours, the no. of electrical outlets rewired = 4
Then, in 1 hour the no. of electrical outlets rewired = 4/1.5
So, in 7.5 hours the no. of electrical outlets rewired =( 4/1.5 ) × 7.5 = 20.
Answer:
Below
Explanation:
4 outlets/ 1.5 hr * 7.5 hr = 20 outlets ( see how 'hr' cancels out and you are left with 'outlets ?)