184k views
10 votes
XYZ Inc. has a facility with six departments (A, B, C, D, E, and F). A summary of the processing sequence for 10 products and the weekly production forecasts for the products are given in the tables below. a. Develop the from-to chart based on the expected weekly production. b. Develop a block layout using SL

1 Answer

5 votes

Answer:

hello your question is incomplete attached below is the complete question

answer : attached below

Step-by-step explanation:

A) develop the from-to chart based on expected weekly production

Firstly we calculate the production quantity processed

i) Qab = 960 + 1200 + 720 + 2400 + 480 + 2400 + 3000 + 960 + 1200 = 13320

ii) Qbd = 2400 + 3000 + 1200 = 6600

B) calculate the values to be entered in cells of table attached below (develop a block layout using SLP )

Cell bc = 11400 + 6600 = 18000

Cell bd = 6600 + 3000 = 9600

Cell be = 4920 + 5400 = 10320

Cell cd = 2400 + 1200 = 3600

Cell ce = 4200 + 7800 = 12000

Cell df = 960 + 1200 = 2160

XYZ Inc. has a facility with six departments (A, B, C, D, E, and F). A summary of-example-1
XYZ Inc. has a facility with six departments (A, B, C, D, E, and F). A summary of-example-2
XYZ Inc. has a facility with six departments (A, B, C, D, E, and F). A summary of-example-3
User Merline
by
4.2k points