Answer:
0.002 Months
Explanation:
Using the graph to estimate when the entire wall will be covered in mold:
Based on the graph, we can see that the area of the wall covered by mold increases rapidly at first and then levels off as time goes on. The graph intersects the horizontal line at 80 square feet at approximately 1.5 months and intersects the vertical line at 100 square feet at approximately 2.25 months. This means that the entire wall will be covered in mold at around 2.25 months if it is not cleaned.
Writing and solving an equation to find the approximate number of months it would take for the mold to cover the entire wall:
We can set the area of the wall a equal to 80 and solve for the value of m:
a = 4e4m
80 = 4e4m
Dividing both sides by 4e4:
m = 80 / 4e4
Evaluating the right-hand side:
m = 0.002
Therefore, it would take approximately 0.002 months, or about 1.44 hours, for the mold to cover the entire wall. However, this calculation assumes that the rate of mold growth remains constant, which is not a realistic assumption. In reality, the rate of mold growth will likely slow down as the amount of available surface area for the mold to grow on decreases.