Answer:
To find the predetermined overhead rate, we need to divide the estimated total overhead by the estimated total machine hours:
predetermined overhead rate = total overhead / total machine hours
predetermined overhead rate = $14,076,000 / 153,000 hours
predetermined overhead rate = $91.70 per machine hour
So, the predetermined overhead rate based on machine hours is $91.70 per machine hour.