40.1k views
2 votes
machine builds 300 bobble-head toys in 5 hours. The machine builds the same number of bobble-head toys each hour. Which table shows the relationship between the amount of time the machine runs and the number of bobble-head toys built?​

machine builds 300 bobble-head toys in 5 hours. The machine builds the same number-example-1
User Jackxujh
by
7.3k points

1 Answer

4 votes

Answer: Graph A is your answer

Explanation:

Graph A becuase since it makes the same bobble-heads each hour and in 2 hours it made 120 then it makes 60 an hour. So 60x5 is 300 so Graph shows the relationship between the amount of time the machine runs and the number of bobble-head toys built.

User Maxdow
by
7.4k points