Answer:
Step-by-step explanation:
In order to answer this question, we need to first calculate the amount of work required to pull the basket of fruit 2.5 M in 180 seconds. This can be done by multiplying the power (10 W) by the time (180 seconds):
Work = 10 W x 180 s = 1800 J
Now, we can calculate the force required to do this work in 180 seconds by dividing the work (1800 J) by the distance (2.5 M):
Force = 1800 J / 2.5 M = 720 N
Therefore, 720 Newtons of force are required to pull a basket of fruit 2.5 M in 180 seconds using a 10 W of power.