86.5k views
0 votes
In project management, the three limitations of scope, time, and cost are referred to as the _____.

1 Answer

1 vote

Answer:

Triple constraints

Step-by-step explanation:

The three primary constraints that project managers should be familiar with are time, scope, and cost. These are frequently known as the triple constraints or the project management triangle.

User Rickfoosusa
by
8.6k points