The final bill is $544
The parts is a one time bill of $265
The labor is $48 per hour, and lets call the hours 'h'
So we can make the equation as:
544 = 265 + 48h
Subtract 265 n both sides
279 = 48h
Divide by 48 on both sides
h = 5.8125
So the number of hours of labor spent repairing the car is 5.8125.