130k views
0 votes
A construction company spends ww weeks extending an existing road. The existing road is 7 miles long. Each week the company completes 0.5 miles of the extension. Which equation models the total length, LL , of the road over time? A L=0.5w+7L=0.5w+7 B L=0.5w−7L=0.5w-7 C W=0.5L+7W=0.5L+7 D W=0.5L−

User Franki
by
8.4k points

1 Answer

2 votes
C hope that helped ;) ; ) :0
User Karan Purohit
by
7.8k points