Answer:
29days
Explanations
Given the equation for the length of the railroad after d days expressed as;
L(d) = 145 - 5d
a) If a railroad crew can lay 5 miles of track each day, then;
5 miles = 1 day
To get the number of days needed to lay all the tracks;
145 miles = x day
Divide both expressions
5/145 = 1/x
Cross multiply
5x = 145
x = 145/5
x = 29days
Hence it will take 29days to lay all the tracks