a railroad crew can lay 5 miles of track each day. they need to lay 145 miles of track. how many days will it take? and how many miles of track does the crew have left after 19 days

a railroad crew can lay 5 miles of track each day. they need to lay 145 miles of track-example-1
User Dcaswell
by
2.1k points

1 Answer

13 votes
13 votes

Answer:

29days

Explanations

Given the equation for the length of the railroad after d days expressed as;

L(d) = 145 - 5d

a) If a railroad crew can lay 5 miles of track each day, then;

5 miles = 1 day

To get the number of days needed to lay all the tracks;

145 miles = x day

Divide both expressions

5/145 = 1/x

Cross multiply

5x = 145

x = 145/5

x = 29days

Hence it will take 29days to lay all the tracks