At the U-Pack Shipping, the workers can unload 24 trucks in 8 hours. Which of the following is a correct unit rate for this situation?

A:1/3 of a truck per hour

B: 1/3 of an hour per truck

C: 3 hours per truck

D: 1 truck per hour

2 Answers

3 votes

Answer:

I believe it is C too

Explanation:

User Behrooz Karjoo
by
8.3k points
3 votes
I believe it is C: 3 hours per truck.Because if you ÷ each by 8, 24 by 8 you get 3 by 1 so you would isolate 24 3=1

User SoH
by
8.3k points