One crew can seal a parking lot in 14 hours and another in 18 hours. How longwill it take to seal the parking lot if the two crews work together?

User Sceptical Jule
by
2.3k points

1 Answer

28 votes
28 votes

Let the amount of work be L.

Therefore, the rate of work of the first team:


(L)/(14)

Similarly, the work rate of the second team is:


(L)/(18)

Therefore, the combined rate of both crews is given by:


(L)/(14)+(L)/(18)=(8L)/(63)

The time is given by:


\text{ time }=\frac{\text{ amount of work}}{\text{ rate}}

Therefore,


\text{ time }=L/(8L)/(63)=L*(63)/(8L)=(63)/(8)=7hours\text{ }53\text{ min}

Hence, the required time is 7 hours 53 minutes

.