91.5k views
0 votes
A potential cost for a government leader using a cost-benefit analysis is

User Brian Lowe
by
6.7k points

2 Answers

4 votes

Answer:

its is D a lower chance of reelection.

Step-by-step explanation:

It is correct because I like spongebob and have a big left toe, and i got a 10% and this is one of the ones I got correct :)

User Wittrup
by
7.6k points
3 votes
A potential cost for a government leader using a cost-benefit analysis is that the leader will fail to consider all the variables that will contribute to the outcome of whatever he or she is planning, since it is often hard to anticipate all possible scenarios in such an analysis
User Bharat Biswal
by
6.7k points