489,650 views
36 votes
36 votes
My parents recently moved to the Poconos, they got 30 or more inches of snow from this last snow storm. It took my Dad 2 hours to clear 10 feet of their driveway. If their driveway is 120 feet long, how long will it take him to clear their driveway?

User ShadowDES
by
2.6k points

1 Answer

29 votes
29 votes

To determine how much will it take to clean a 120ft driveway considering that it took him 2hs to clear 10ft and that the cleaning rate is constant, you can use cross multiplication:

10ft______2hs

120ft_____xhs

If the cleaning rate is the same, then the ratios between both are the same:


(2)/(10)=(x)/(120)

From this expression, you can determine the time by multiplying both sides of the equal sign by 120


\begin{gathered} 120((2)/(10))=(120x)/(120) \\ 24=x \end{gathered}

It will take him 24 hours to clear the 120ft driveway.

User Gfyans
by
2.8k points