34.7k views
5 votes
a contractor crew can frame 3 houses in a week how long will it take them to frame 54 houses if they frame the same number each week

User Jasjeet
by
8.6k points

1 Answer

6 votes
To set up an equation for this you can use a variable to represent your unknown (in this case the unknown is how long it will take to frame 54 houses)

We know that 3 houses can be framed in 1 week so you can represent the equation as

3x=54 (3 being the amount of houses framed in 1 week, x being how many weeks it will take to frame 54 houses)

You can isolate X by dividing both sides by 3 (3x/3 = 54/3) which simplifies to
x = 54/3
User Zsub
by
7.9k points