22.9k views
2 votes
Renee can sew a 25-square-foot quilt in 16 hours. Genera can sew the same size quilt in 12 hours. How long would it take them to sew the quilt working together?

User Quanturium
by
8.1k points

1 Answer

6 votes

Answer:
6(6)/(7)\text{ hours}

Explanation:

We know that if A takes time x and B time y to do a job individually, then the total time taken both of them if they work together is given by :-


(1)/(T)=(1)/(x)+(1)/(y)

According to the given question, substitute x= 16 and y= 12 in the above equation, we get the total time taken to sew the quilt working together is given by :-


(1)/(T)=(1)/(16)+(1)/(12)\\\\Rightarrow\\frac{1}{T}=(7)/(48)\\\\\Rightarrow\ T=(48)/(7)=6(6)/(7)

Hence, the time taken to sew the quilt working together =
6(6)/(7)\text{ hours}

User Tangrammer
by
8.2k points