A construction company delivered 40 loads of concrete in 5 days.

What was their rate of work?



A.




B.




C.




D.

User Rxg
by
7.2k points

1 Answer

3 votes
Well 40 divided by 5 is 8 and you don't have options so I would say 8 loads a day :)