The type of budget that is prepared for the expected capacity level only is called a _______. static budget. flexible budget. continuous budget. master budget.

User Urznow
by
7.7k points

1 Answer

4 votes
The budget that is prepared for the expected capacity level only is called a fixed or static budget.