Voluntarily accepting a known risk is called _______ of risk.

A. assignment
B. allocation
C. assumption
D. reallocation

User Shinjin
by
7.5k points

2 Answers

4 votes
Im pretty sure the answer is C. assumption
User Tim Schmidt
by
8.1k points
2 votes
i think its c. assumption but i am not sure if this answer is correct or wrong.
User Winkster
by
7.7k points