116k views
9 votes
PLS HELP

Determine the quantity of work done when a crane lifts a 200-N block from 2 m above the ground to 6 m above the ground.

1 Answer

9 votes
Ok do 200x2 then divide by 6
User Daxeh
by
5.0k points