"To make concrete is takes 8 parts crushed gravel, 7 parts water and 5 parts cement mix. A worker needs to make 220kg of concrete. How much crushed gravel, water and cement mix is needed?"

Please show the work, thank you

User Jammy Lee
by
7.8k points

2 Answers

3 votes
Ratio of crushed gravel to water to cement mix = 8:7:5 (for a total of 20 parts)

Thus . .
8/20 = fraction of crushed gravel
7/20 = fraction of water
5/20 = fraction of cement mix

If total is 200 kg, then . . .
(8/20)*(200 kg) = 80 kg crushed gravel
(7/20)*(200 kg) = 70 kg water
(5/20)*(200 kg) = 50 kg cement mix



User Oliver Cooke
by
7.6k points
2 votes
8+7+5=20
220/20=11
8 x 11=88
7 x 11=77
5 x 11=55

User Kirogasa
by
8.6k points