menu
Qammunity
Login
Register
My account
Edit my Profile
Private messages
My favorites
Ask a Question
Questions
Unanswered
Tags
Categories
Ask a Question
The function =AVERAGE(B9:B16) is shown in the ____.
asked
Sep 16, 2017
15.3k
views
2
votes
The function =AVERAGE(B9:B16) is shown in the ____.
Mathematics
high-school
Abraham Yusuf
asked
by
Abraham Yusuf
8.8k
points
answer
comment
share this
share
0 Comments
Please
log in
or
register
to add a comment.
Please
log in
or
register
to answer this question.
1
Answer
5
votes
It's shown in the fraction. Hoped this helped
Derchambers
answered
Sep 23, 2017
by
Derchambers
8.3k
points
ask related question
comment
share this
0 Comments
Please
log in
or
register
to add a comment.
← Prev Question
Next Question →
Related questions
asked
May 12, 2024
74.3k
views
ASME B16.15-2013 (Cast Copper Alloy Threaded Fittings) covers classes?
Koregan
asked
May 12, 2024
by
Koregan
8.1k
points
Engineering
college
1
answer
2
votes
74.3k
views
asked
Nov 14, 2024
11.3k
views
Some of the standards for components in ASME B31.3, table 326.1 (e.g. ASME B16.9, B16.11, and B16.28) state that pressure-temperature ratings are based on straight seamless pipe. Except as limited in the
Nitz
asked
Nov 14, 2024
by
Nitz
7.8k
points
Engineering
college
1
answer
1
vote
11.3k
views
asked
Apr 21, 2024
73.6k
views
Bolting having not more than ______ Kai specified minimum yield strength shall not be used for flanged joints rated ASME B16.5 class 400 and higher.
Amklose
asked
Apr 21, 2024
by
Amklose
7.8k
points
Engineering
college
1
answer
1
vote
73.6k
views
Ask a Question
Welcome to QAmmunity.org, where you can ask questions and receive answers from other members of our community.
9.4m
questions
12.2m
answers
Other Questions
How do you can you solve this problem 37 + y = 87; y =
What is .725 as a fraction
How do you estimate of 4 5/8 X 1/3
A bathtub is being filled with water. After 3 minutes 4/5 of the tub is full. Assuming the rate is constant, how much longer will it take to fill the tub?
i have a field 60m long and 110 wide going to be paved i ordered 660000000cm cubed of cement how thick must the cement be to cover field
Twitter
WhatsApp
Facebook
Reddit
LinkedIn
Email
Link Copied!
Copy
Search Qammunity